Steel Stud Floor Framing
Manufacturer of viperstud framerite studrite genieclip and joistrite.
Steel stud floor framing. Long term maintenance costs are reduced because steel. Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications. Get free shipping on qualified metal wall framing studs drywall or buy online pick up in store today in the building materials department. Scafco s products exceed industry standards as they are manufactured from 57 ksi steel in place of 50 ksi and g90 in place of g60 for 68 mil and heavier.
2 1 2 250s 3 1 2 350s 3 5 8 362s 4 400s 5 1 2 550s 6 600s 8 800s 10. Provide a lightweight low cost rigid floor assembly c joist components provide an economical lightweight alternative to open web trusses bar joists engineered lumber cast in place or hollow core floor assemblies. Item 28466 model 108945. We offer a complete line of cold formed steel framing products like metal stud framing rc channel metal floor joists metal lath and metal corner bead.
Metal stud framing costs. Compare click to add item prostud 1 5 8 25 gauge interior galvanized steel wall framing stud to the compare list. Read more about steel framing studs and track. Steel framing is easier to handle because steel studs weigh 1 less than wood studs and can be installed at 4 on center.
Click to add item prostud 1 5 8 25 gauge interior galvanized steel wall framing stud to the compare list. That s why scafco steel framing products are manufactured from 100 prime mill certified steel. Structural track usually in the same gauge as the. Installing steel studs in the average 2 000 square foot home will run an average of 21 000 with a range of 19 000 to 25 000 though metal studs currently run in the 2 to 4 per square foot range steel prices fluctuate over time causing material costs to rise or fall regardless of the steel market labor remains relatively stable at about 5 to 10 per square foot.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud. Depending on loads and spans c joists are typically spaced at 12 16 19 2 or 24 on center spacing.